| Sept 23, 2008 | |
Procurement of computer tables and chairs |
|
2008-09-436 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of computer tables and chairs |
|
Implementing Officer: |
Division of City Schools |
|
Brief Description : |
One hundred twenty five (125) sets computer tables and chairs |
|
Approved Budget for the Contract (ABC) |
1,354,250.00 |
|
Delivery Period |
Thirty (30) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 24-Oct 6 |
|
Deadline for the issuance of bid documents |
Oct 6-4:00 pm |
|
Pre-Bid Conference |
Oct 1-2:00 pm |
|
Bidding Proper, opening of eligibility and bid envelopes |
Oct 14-2:00 pm |
|
Bid Evaluation |
Oct 15 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 22, 2008 | |
Procurement of various sports supplies and materials |
|
2008-09-430 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of various sports supplies and materials |
|
Implementing Officer: |
Division of City Schools |
|
Brief Description : |
Various sports supplies and materials |
|
Approved Budget for the Contract (ABC) |
1,316,440.00 |
|
Delivery Period |
Thirty (30) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 24-Oct 6 |
|
Deadline for the issuance of bid documents |
Oct 6-4:00 pm |
|
Pre-Bid Conference |
Oct 1-2:20 pm |
|
Bidding Proper, opening of eligibility and bid envelopes |
Oct 14-2:20 pm |
|
Bid Evaluation |
Oct 15 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 23, 2008 | |
Procurement of various Medical Gases |
|
2008-09-437 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of various Medical Gases |
|
Implementing Officer: |
Ospiatl ng Maynila Medical Center |
|
Brief Description : |
Various Medical Gases |
|
Approved Budget for the Contract (ABC) |
2,499,750.00 |
|
Delivery Period |
as requested by the end-user |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 24-Oct 6 |
|
Deadline for the issuance of bid documents |
Oct 6-4:00 pm |
|
Pre-Bid Conference |
Oct 1-2:10 pm |
|
Bidding Proper, opening of eligibility and bid envelopes |
Oct 14-2:10 pm |
|
Bid Evaluation |
Oct 15 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 22, 2008 | |
Procurement of various equipments |
|
2008-09-438 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of various equipments |
|
Implementing Officer: |
City Budget Office |
|
Brief Description : |
Various equipments |
|
Approved Budget for the Contract (ABC) |
58,640.00 |
|
Delivery Period |
Fifteen (15) Calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 22-29 |
|
Deadline for the issuance of bid documents |
Sept 29-4:00 pm |
|
Pre-Bid Conference |
Not Required |
|
Bidding Proper, opening of eligibility and bid envelopes |
Oct 7-2:50 pm |
|
Bid Evaluation |
Oct 7 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 22, 2008 | |
Procurement of IT Equipment and Software |
|
2008-09-434 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of IT Equipment and Software |
|
Implementing Officer: |
Division of City Schools |
|
Brief Description : |
IT Equipment and Software |
|
Approved Budget for the Contract (ABC) |
2,550,274.00 |
|
Delivery Period |
Thirty (30) Calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 24-Oct 6 |
|
Deadline for the issuance of bid documents |
Oct 6-4:00 pm |
|
Pre-Bid Conference |
Oct 1-2:30 pm |
|
Bidding Proper, opening of eligibility and bid envelopes |
Oct 14-2:30 pm |
|
Bid Evaluation |
Oct 15 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 22, 2008 | |
Procurement of Coco Cloth |
|
2008-09-433 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of Coco Cloth |
|
Implementing Officer: |
Manila City Council |
|
Brief Description : |
80 rolls coco cloth |
|
Approved Budget for the Contract (ABC) |
251,200.00 |
|
Delivery Period |
Fifteen (15) Calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 22-29 |
|
Deadline for the issuance of bid documents |
Sept 29-4:00pm |
|
Pre-Bid Conference |
Not Required |
|
Bidding Proper, opening of eligibility and bid envelopes |
Oct 7-2:40 pm |
|
Bid Evaluation |
Oct 8 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 22, 2008 | |
Procurement of Food And Drinks |
|
2008-09-432 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of Food & Drinks |
|
Implementing Officer: |
Manila Barangay Bureau |
|
Brief Description : |
Food & Drinks |
|
Approved Budget for the Contract (ABC) |
100,000.00 |
|
Delivery Period |
As requested by the end-user |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 22-29 |
|
Deadline for the issuance of bid documents |
Sept 29-4:00pm |
|
Pre-Bid Conference |
Not Required |
|
Bidding Proper, opening of eligibility and bid envelopes |
Oct 7-2:10 pm |
|
Bid Evaluation |
Oct 8 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 22, 2008 | |
Procurement of various construction supplies and materials for the Installation of one (1) set- main stair at the Bordner building of Manila Science High School |
|
2008-09-431 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of various construction supplies and materials for the Installation of one (1) set- main stair at the Bordner building of Manila Science High School |
|
Implementing Officer: |
Manila Science High School, Division of City Schools |
|
Brief Description : |
Various construction supplies and materials |
|
Approved Budget for the Contract (ABC) |
499,973.50 |
|
Delivery Period |
Thirty (30) calendat days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 22-29 |
|
Deadline for the issuance of bid documents |
Sept 29-4:00pm |
|
Pre-Bid Conference |
Not Required |
|
Bidding Proper, opening of eligibility and bid envelopes |
Oct 7-2:30 pm |
|
Bid Evaluation |
Oct 8 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 16, 2008 | |
Procurement of various construction supplies & materials |
|
2008-09-416 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of various construction supplies & materials |
|
Implementing Officer: |
Department of Engineering & Public Works |
|
Brief Description : |
Various construction supplies and materials |
|
Approved Budget for the Contract (ABC) |
472,417.00 |
|
Delivery Period |
Fifteen (15) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 17-24 |
|
Deadline for the issuance of bid documents |
Sept 24-4:00 pm |
|
Pre-Bid Conference |
Not Required |
|
Bidding Proper, opening of eligibility and bid envelopes |
Sept 30-4:00 pm |
|
Bid Evaluation |
Oct 1 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 19, 2008 | |
Procurement of various construction supplies and materials for the Repair / Rehabilitation of M. Hizon Elementary School |
|
2008-09-423 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of various construction supplies and materials for the Repair / Rehabilitation of M. Hizon Elementary School |
|
Implementing Officer: |
Division of City Schools |
|
Brief Description : |
Various construction supplies and materials |
|
Approved Budget for the Contract (ABC) |
4,036,850.00 |
|
Delivery Period |
Forty Five (45) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 19-Oct 2 |
|
Deadline for the issuance of bid documents |
Oct 2-4:00 pm |
|
Pre-Bid Conference |
Sept 26-2:00 pm |
|
Bidding Proper, opening of eligibility and bid envelopes |
Oct 8-2:00 pm |
|
Bid Evaluation |
Oct 9 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 22, 2008 | |
Procurement of different sizes of boxes for the use of the City Auditor's Office |
|
2008-09-435 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of different sizes of boxes for the use of the City Auditor's Office |
|
Implementing Officer: |
Office of the Mayor |
|
Brief Description : |
Different sizes of boxes for the use of City Auditor's Office |
|
Approved Budget for the Contract (ABC) |
117,250.00 |
|
Delivery Period |
Fifteen (15) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 22-29 |
|
Deadline for the issuance of bid documents |
Sept 29-4:00pm |
|
Pre-Bid Conference |
Not Required |
|
Bidding Proper, opening of eligibility and bid envelopes |
Oct 7-2:20pm |
|
Bid Evaluation |
Oct 8 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 22, 2008 | |
Procurement of various tires and batteries |
|
2008-09-429 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of various tires and batteries |
|
Implementing Officer: |
Public Recreations Bureau |
|
Brief Description : |
Various tires and batteries |
|
Approved Budget for the Contract (ABC) |
70,000.00 |
|
Delivery Period |
Fifteen (15) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 22-29 |
|
Deadline for the issuance of bid documents |
Sept 29-4:00pm |
|
Pre-Bid Conference |
Not Required |
|
Bidding Proper, opening of eligibility and bid envelopes |
Oct 7-2:00pm |
|
Bid Evaluation |
Oct 7 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 12, 2008 | |
Procurement of various constcruction supplies & materials for the repair of Judge Vergara Court Room Chamber & Staff Room Branch 49 RTC, Manila |
|
2008-09-418 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of various constcruction supplies & materials for the repair of Judge Vergara Court Room Chamber & Staff Room Branch 49 RTC, Manila |
|
Implementing Officer: |
City Engineers Office |
|
Brief Description : |
Various Construction Supplies & Materials |
|
Approved Budget for the Contract (ABC) |
470,087.00 |
|
Delivery Period |
Thirty (30) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 12-25 |
|
Deadline for the issuance of bid documents |
Sept 25-4:00pm |
|
Pre-Bid Conference |
Not Required |
|
Bidding Proper, opening of eligibility and bid envelopes |
Sept 30-3:10 pm |
|
Bid Evaluation |
Oct 1 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 16, 2008 | |
Procurement of Sports Uniforms |
|
2008-09-424 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of Sports Uniforms |
|
Implementing Officer: |
Office of the City Accountant |
|
Brief Description : |
Sports Uniforms |
|
Approved Budget for the Contract (ABC) |
61,600.00 |
|
Delivery Period |
Fifteen (15) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 17-24 |
|
Deadline for the issuance of bid documents |
Sept 24-4:00 pm |
|
Pre-Bid Conference |
Not Required |
|
Bidding Proper, opening of eligibility and bid envelopes |
Sept 30-2:35 pm |
|
Bid Evaluation |
Oct 1 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 18, 2008 | |
Procurement of construction supplies & materials for the repainting of public schools perimeter fence, district I-VI , Manila |
|
2008-09-426 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of construction supplies & materials for the repainting of public schools perimeter fence, district I-VI , Manila |
|
Implementing Officer: |
City Engineers Office |
|
Brief Description : |
Construction supplies & materials for the repainting of public schools perimeter fence, district I-VI, Manila |
|
Approved Budget for the Contract (ABC) |
2,825,150.00 |
|
Delivery Period |
Fifteen (15) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 19-Oct 2 |
|
Deadline for the issuance of bid documents |
Oct 2-4:00 pm |
|
Pre-Bid Conference |
Sept 26-2:10 pm |
|
Bidding Proper, opening of eligibility and bid envelopes |
Oct 8-2:10 pm |
|
Bid Evaluation |
Oct 9 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 16, 2008 | |
Procurement of Sports Uniforms |
|
2008-09-425 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of Sports Uniforms |
|
Implementing Officer: |
Department of Engineering & Public Works |
|
Brief Description : |
Sports Uniforms |
|
Approved Budget for the Contract (ABC) |
74,800.00 |
|
Delivery Period |
Fifteen (15) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 17-24 |
|
Deadline for the issuance of bid documents |
Sept 24-4:00 pm |
|
Pre-Bid Conference |
|
|
Bidding Proper, opening of eligibility and bid envelopes |
Sept 30-3:20 pm |
|
Bid Evaluation |
Oct 1 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 16, 2008 | |
Procurement of various construction supplies & materials |
|
2008-09-420 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of various construction supplies & materials |
|
Implementing Officer: |
City General Services Office |
|
Brief Description : |
Various construction supplies & materials |
|
Approved Budget for the Contract (ABC) |
59,907.30 |
|
Delivery Period |
Fifteen (15) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 17-24 |
|
Deadline for the issuance of bid documents |
Sept 24-4:00 pm |
|
Pre-Bid Conference |
|
|
Bidding Proper, opening of eligibility and bid envelopes |
Sept 30-3:35 pm |
|
Bid Evaluation |
Oct 1 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 15, 2008 | |
Procurement of various construction supplies & materials |
|
2008-09-412 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of various construction supplies & materials |
|
Implementing Officer: |
Office of the Mayor |
|
Brief Description : |
Various construction supplies & materials |
|
Approved Budget for the Contract (ABC) |
555,685.00 |
|
Delivery Period |
Fifteen (15) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 17-24 |
|
Deadline for the issuance of bid documents |
Sept 24-4:00 pm |
|
Pre-Bid Conference |
|
|
Bidding Proper, opening of eligibility and bid envelopes |
Sept 30-3:00 pm |
|
Bid Evaluation |
Oct 1 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 16, 2008 | |
Procurement of Various Janitorial Supplies |
|
2008-09-421 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of Various Janitorial Supplies |
|
Implementing Officer: |
City General Services Office |
|
Brief Description : |
Various Janitorial Supplies |
|
Approved Budget for the Contract (ABC) |
199,988.00 |
|
Delivery Period |
Fifteen (15) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 17-24 |
|
Deadline for the issuance of bid documents |
Sept 24-4:00 pm |
|
Pre-Bid Conference |
|
|
Bidding Proper, opening of eligibility and bid envelopes |
Sept 30-3:40 pm |
|
Bid Evaluation |
Oct 1 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 16, 2008 | |
Procurement of Sports Uniforms |
|
2008-09-422 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of Sports Uniforms |
|
Implementing Officer: |
City General Services Office |
|
Brief Description : |
Sports Uniform |
|
Approved Budget for the Contract (ABC) |
59,840.00 |
|
Delivery Period |
Fifteen (15) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 17-24 |
|
Deadline for the issuance of bid documents |
Sept 24-4:00 pm |
|
Pre-Bid Conference |
|
|
Bidding Proper, opening of eligibility and bid envelopes |
Sept 30-2:50 pm |
|
Bid Evaluation |
Oct 1 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 16, 2008 | |
Procurement of various construction supplies and materials |
|
2008-09-411 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of various construction supplies and materials |
|
Implementing Officer: |
PRB- Parks Development Office |
|
Brief Description : |
Various construction supplies and materials |
|
Approved Budget for the Contract (ABC) |
433,125.00 |
|
Delivery Period |
Thirty (30) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 17-24 |
|
Deadline for the issuance of bid documents |
Sept 24-4:00 pm |
|
Pre-Bid Conference |
|
|
Bidding Proper, opening of eligibility and bid envelopes |
Sept 30-2:10 pm |
|
Bid Evaluation |
Oct 1 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 16, 2008 | |
Procurement of various construction supplies and materials for the repair of Judge Villena Court Room Chamber & Staff Room |
|
2008-09-415 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of various construction supplies and materials for the repair of Judge Villena Court Room Chamber & Staff Room |
|
Implementing Officer: |
City Engineers Office |
|
Brief Description : |
Various construction supplies and materials |
|
Approved Budget for the Contract (ABC) |
496,917.00 |
|
Delivery Period |
Thirty (30) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 17-24 |
|
Deadline for the issuance of bid documents |
Sept 24-4:00 pm |
|
Pre-Bid Conference |
|
|
Bidding Proper, opening of eligibility and bid envelopes |
Sept 30-3:55 pm |
|
Bid Evaluation |
Oct 1 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 16, 2008 | |
Procurement of various construction supplies and materials |
|
2008-09-419 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of various construction supplies and materials |
|
Implementing Officer: |
City Engineers Office |
|
Brief Description : |
Various construction supplies and materials |
|
Approved Budget for the Contract (ABC) |
496,917.00 |
|
Delivery Period |
Thirty (30) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 17-24 |
|
Deadline for the issuance of bid documents |
Sept 24-4:00 pm |
|
Pre-Bid Conference |
|
|
Bidding Proper, opening of eligibility and bid envelopes |
Sept 30-2:40 pm |
|
Bid Evaluation |
Oct 1 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 12, 2008 | |
Procurement of MTPB Enforcement's Uniforms and Accessories |
|
2008-09-417 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of MTPB Enforcement's Uniforms and Accessories |
|
Implementing Officer: |
Manila Traffic and Parking Bureau |
|
Brief Description : |
MTPB Enforcement's Uniforms and Accessories |
|
Approved Budget for the Contract (ABC) |
700,000.00 |
|
Delivery Period |
Thirty (30) calendar days |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 12-25 |
|
Deadline for the issuance of bid documents |
Sept 25-4:00 pm |
|
Pre-Bid Conference |
|
|
Bidding Proper, opening of eligibility and bid envelopes |
Sept 30-2:20 pm |
|
Bid Evaluation |
Oct 1 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Sept 15, 2008 | |
Procurement of 5 units 7.5 ton air-conditioners |
|
2008-09-410 |
|
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
|
Name of Project : |
Procurement of 5 units 7.5 ton air-conditioners |
|
Implementing Officer: |
Office of the Mayor |
|
Brief Description : |
Airconditioners 7.5 ton w/ installation |
|
Approved Budget for the Contract (ABC) |
844,000.00 |
|
Delivery Period |
15 cd |
Prospective bidders should have experience in undertaking a similar project within the last three (3) years with an amount of at least 50% of the proposed project for bidding. The Eligibility Check/Screening as well as the Preliminary Examination of Bids shall use non-discretionary "pass/fail" criteria. Post-qualification of the lowest calculated bid shall be conducted. All particulars relative to Eligibility Statement and Screeing, Bid Security, Performance Security, Pre-Bidding Conference(s), Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulations (IRR-A). The complete schedule of activities is listed, as follows: |
|
|
Activities (Schedule for 2007-2008) |
|
|
Issuance of Bid Documents |
Sept 17-24 |
|
Deadline for the issuance of bid documents |
Sept 24-4:00 pm |
|
Pre-Bid Conference |
|
|
Bidding Proper, opening of eligibility and bid envelopes |
Sept 30-2:30 pm |
|
Bid Evaluation |
Oct 1 |
The City of Manila, through its Bids and Awards Committee (BAC), invites suppliers / manufacturers / distributors / contractors to apply for the hereunder project: |
|
| Aug 29 , 2008 | |
Procurement of Drugs and Medicines | |